Town of Howard Mining Permit Application
9750 30th St. Colfax WI 54730
Filing Fee $500

Date of Application ___________________________________

Company Name___________________________________________________

Federal Employer ID_____________________ State ID___________________

Contact Person ____________________________________________________

Address__________________________________________________________

Phone _______________________ Fax___________________Cell________________

Email_____________________________________________________________

Proof of Insurance (Please attach)

Legal Description of land for proposed mine development _________________________

______________________________________________________________________________________

Tax parcel number____________________________________________________

Name and address of surface land owner ___________________________________­­_

______________________________________________________________________

Name and address of mineral owner _________________________________________

_______________________________________________________________________

Describe current land uses within and adjacent to the project area ___________________

________________________________________________________________________

List other permits (county, state etc.) necessary for this project, indicate status and provide a copy. _______________________________________________________

_____________________________________________________________________

 

Specify total area (in acres) to be affected by this project. Include areas for future expansion, stockpiling, processing, haul roads, settling basins, buildings, parking facilities. _________________

Describe the method that will be used to dispose of brush and other vegetative debris.

_______________________________________________________________________

Describe the methods that will be used to retain topsoil___________________________

_______________________________________________________________________

Describe material to be mined_______________________________________________

Which town and county roads will be used to transport material?____________________

________________________________________________________________________

Describe the methods used to control dust on haul roads __________________________

________________________________________________________________________

Ultimate destination of material ______________________________________________

How many loads per day?_________________________ Weight per load__________

Length of time mine is to operate _______________20__ to ________________20__

Hours of operation each day________________________

Identify the number of employees expected to work at the site and the facilities that will be provided ____________________________________________________________

______________________________________________________________________

Describe the processing methods that will be used at the site. ______________________

________________________________________________________________________

________________________________________________________________________

________________________________________________________________________

Describe the volume of water needed at the site and the source of the water.___________

________________________________________________________________________
List chemical substances that will be used at the site and how they will be stored at the site. ____________________________________________________________________

________________________________________________________________________

 

Number and type of structures to be erected on site______________________________

_______________________________________________________________________

________________________________________________________________________

 

Indicate the observed or estimated (circle one) groundwater elevation in the project area and reference depth to a permanent benchmark _____________feet

List resources that may be impacted by this project, identify impacts, and describe measures that will be taken to mitigate those impacts _____________________________

________________________________________________________________________

 

Describe measures that will be taken to screen the operation from view of surrounding land uses or an explanation of why such measures are not needed. _________________

_______________________________________________________________________

Describe erosion control practices that will be used during mining. If no measures will be used, explain why none are needed.___________________________________________

________________________________________________________________________

 

Has a study been conducted to identify endangered species on the land? ______________

Has an environmental impact statement been prepared? ___________ (Please attach)

Describe progressive reclamation activities that will occur over the life of the operation.

________________________________________________________________________

________________________________________________________________________

 

Describe the methods that will be used at the cessation of seasonal operations to stabilize slopes from erosion. _______________________________________________________
________________________________________________________________________

Describe the interim reclamation methods that will be used if the site will become inactive at the close of current operations for an unspecified period of time ___________

________________________________________________________________________

________________________________________________________________________

Describe proposed reclamation including final slopes, high wall reduction, benching, terracing, and other structural slope stabilization measures. ________________________

________________________________________________________________________

________________________________________________________________________

Describe anticipated topography, water impoundments, artificial lakes, and future land use of the site. __________________________________________________________

_______________________________________________________________________

Describe plans for the disposition of surface structures, roads, and related facilities after completion of mining. _____________________________________________________

________________________________________________________________________

Describe the methods proposed for the disposal or reclamation of oversize and undersized materials. _______________________________________________________________

________________________________________________________________________

Describe or attach a copy of a seeding plan that includes methods of seed bed preparation, seed mixtures, seeding rates, mulching, and other techniques needed to accomplish site stabilization. ________________________________________________________________________

________________________________________________________________________

Describe long term maintenance needed to support reclamation. ____________________

________________________________________________________________________

 

Provide an estimate of the reclamation cost of each phase of the project or the entire site if phasing is not planned.

________________________________________________________________________

________________________________________________________________________

To the best of my knowledge, I certify that the information provided on this application and accompanying documents is true and accurate.

 

Property Owners signature__________________________________Date____________
Signature of this application authorizes the Town of Howard staff and its designees to enter upon the property to perform needed inspections. Entry may be without prior notice.

 

Mineral Owners signature___________________________________Date____________

Company________________________________________________________________
Signature of this application authorizes the Town of Howard staff and its designees to enter upon the property to perform needed inspections. Entry may be without prior notice.